One-day systems have their place. But before choosing a floor based on speed alone, understand what is being applied to your concrete, how the slab is prepared and what the warranty actually covers.
Most rapid-return systems use fast-curing polyaspartic or polyurea technology. The issue is not the technology, it is whether the full system suits the slab and how the floor will be used.
Every slab is different. Compare our systems and click through to see the full build, applications and FAQs for each.
Multi-coat decorative flake system for garages, homes, showrooms and commercial spaces.
View System →
Seamless high-build epoxy in any colour for warehouses, workshops and garages.
View System →
Mechanically refined concrete with no coatings to peel. Permanent, low-maintenance, architectural.
View System →
Heavy-duty urethane cement for commercial kitchens, food processing and industrial facilities.
View System →
Rapid-cure systems for cool rooms, car parks and projects that cannot afford downtime.
View System →
Where site conditions suit the specification, our premium flake system can be built with multiple layers designed to prepare, protect and fully encapsulate the floor.
Polyaspartic as Primer
Each stage has a purpose. The aim is not simply more coats, it is the correct preparation, bonding and protection for the slab
Where required by the slab assessment, a moisture-vapour barrier helps manage moisture vapour moving through the concrete and provides a more suitable foundation for the coating system.
The coloured base and full broadcast create a uniform decorative layer and build the flooring system before the protective clear coats are applied.
Two protective topcoats add film build, help encapsulate the flake and provide UV, wear, stain and chemical resistance for the finished surface.
A one-day installation is not automatically inferior. This comparison shows the questions worth asking before deciding.
Many coating warranties contain exclusions relating to moisture transmission, rising damp, concrete cracking, substrate movement or other conditions originating in the slab. Always ask for the written warranty and understand exactly what is covered.
Preparation is where a flooring system starts. See how we approach real concrete coating projects.
Compare flooring quotes on what is actually being installed — not just the advertised installation time.
Ask whether the slab will be mechanically diamond ground before coating.
Ask how slab moisture is checked and what happens if readings are elevated.
Find out whether the first layer is a primer, MVB, epoxy base or another fast-cure coating.
Ask how the flake is encapsulated and how many protective topcoats are included.
Separate foot-traffic time from vehicle-traffic time and full cure.
Ask for the written warranty and check the exclusions relating to the concrete substrate.
Tell us how the space will be used and we can recommend a flake flooring system based on the slab, exposure, traffic and downtime requirements.
Get Your Free Quote Call (08) 6629 6400Preparation first. System build second. Speed third.
Disclaimer: The information on this page is general in nature and does not replace a site inspection, written specification or project-specific quotation. Coating performance, system selection and return-to-service times depend on product selection, film build, substrate condition and site conditions. Moisture-vapour barriers are used where required by assessment and specification. All work is subject to our Terms & Conditions , Warranty and Privacy Policy .